Ground floor, roof frame Section A-B, Section G-H Basement plan, Section C-D, Section E-F North elevation, East elevation (Two other copies of drawing 2197 are known, one showing the drainage. the other both drainage and lighting) |
|||
BW 30a/15: | Bauleitung drawing 2136 of 22/2/1943 Neg. nos 6231 and 20922/7 Krematorium III, BW 30a. Ergänzungsblatt Vorderansicht, Seitenansicht. Erdgeschoß Grundriß Krematorium III, Worksite 30a. Amendment sheet Front elevation, side elevation, ground floor plan [Copy of the original] |
Kr III | |
BW30-30a/16: | HUTA drawing 109/16a of 9/10/1943 Also dated 25.XI.43 Neg. no. 20922/8 KB (or Projekt) Nr 7015. TB [Technisches Büro] Nr 109, Blatt Nr l6a Krematorium 2(3) Construction (or project) no. 7015, Technical Office no. 109, Sheet no. 16a Krematorium II (and III) (HUTA drawing based on Bauleitung drawings 933 and 934) |
Kr II/III | |
BW30-30a/17: | HUTA drawing 109/15 of 24/9/1943 Neg. no. 20922/9 Krematorium 2(3) Kellergeschoß u. Fundamente Krematorium II (and III) Basement and foundations (HUTA drawing based on Bauleitung drawing 932) |
Kr II/III | |
B W30/18: | HUTA drawing, no number or date Neg. no. 20946/2 Hand written title: “Krema 2” [Title omitted, should be:] Erdaushub Grundriß, Schnitt a-a, Schnitt b-b [Excavation] Plan view, Section a-a. Section b-b [Copy of the original Huta drawing 109/13a] |
Kr II | |
BW30a/19: | HUTA drawing 109/14a of 23/9/1943 Also dated 25.XI.43 Neg. no. 20922/11 Krematorium 3 — Erdaushub Grundriß, Schnitt a-a, Schnitt b-b Krematorium III — Excavation Plan view, Section a-a, Section b-b |
Kr III | |
BW30/19a: | HUTA drawing 109/13a of 21/9/1943 Also dated 25.XI.43 Neg. no. 20922/10 Krematorium 2 — [omitted title: “Erdaushub"] Krematorium II — [Excavation] |
Kr II | |
BW 30/20: | Konrad SIEGNITZ drawing 1305 of 7/8/1942 (Holzliste 637 to 39) — (Timber lists 637 to 39) [Baugeschäft Konrad Siegnitz, Eisenbeton u. Hochbau, Beuthen, upper Silesia, Lindenstraße 38] Neg. no. 20946/3 Vollmar Bohlen Binder Dachkonstruktion Für Bau: KGL BW 30 Zentralbauleiting der Waffen-SS und Polizei — Auschwitz Längschnitt, Draufsicht, Schnitt Hauptdach Schnitt Seitenflügel, Schornsteinschnitt, Punkt A Roof frame in “Vollmar” [Vollmechanisierung / Full mechanization?] beams For building: POW camp BW 30 Waffen SS and Police Central Construction Management Auschwitz Longitudinal section, Plan view, Main roof cross-section Wing cross-section. Chimney section, Point A In statischer Hinsicht geprüft. Beuthen, upper Silesia, Lindenstraße 46, on 31/8/42. Prüfingenieur bei der statischen Prüfstelle, Beuthen, Upper Silesia, Baurat A Bsdok. Static calculations checked by the authorised inspection engineer Baurat A Bsdok of Beuthen on 31/8/42 Received at the Bauleitung on 3/9/42 by Ertl and Bischoff |
Kr II | |
BW30/21: | File containing two HUTA drawings: | ||
(1) — Huta drawing 109/10 of 13/11/1942 Neg. no. 20946/4 Auschwitz Kr — Decke über dem Müllverbrennungsraum Unterzug I u. II (Pos. 41 u. 42) Schnitt a-a, Türsturz (Pos. 16) Auschwitz Kr — Ceiling over the waste incinerator room Cross-beams I and II (items 41 and 42) Section a-a, Door lintel (item 16) |
Kr II | ||
(2) — Huta drawing 109/11 of 1/3/1943 Neg. no. 20946/5 Krema — Deckenbalken im Müllverbrennungsraum Schnitt a-b. Unterzug im Müllverbrennungsraum Krema — Main ceiling beam in the waste incinerator room Section a-b, cross-beam in the waste incinerator room |
Kr II | ||
BW 30b- 30c/22: | Bauleitung drawing 1678 of 14/8/1942 Neg. no. 20946/6 Einäscherungsanlage im KGL Giebelansicht, Schnitt a-b, Ansicht Erdgeschoßgrundriß. Fundamentplan Cremation installation in the POW camp Gable end elevation, Section a-b, Elevation Ground floor plan, Foundation plan |
Kr IV | |
BW 30b-30c/23: | Bauleitung drawing 2036 of 11/1/1943 Neg. nos 6234 and 20818/10 Einäscherungsanlage im KGL Deckblatt für die Zeichnung Nr 1678 Querschnitt A-B, Querschnitt C-D, Ansicht Erdgeschoßgrundriß Cremation installation in the POW camp Correction sheet for drawing 1678 Cross-section A-B, Cross-section C-D, Elevation Ground floor plan |
Kr IV/V |