Drawing 1173-1174 (p) |
|
|
|
Translation of inscriptions:
(left to right and top to bottom) |
Drawing 1174: |
— |
Erdanschüttung / earth bank. |
— |
Vorlage / hard fill. |
— |
Gewachsener Boden / natural earth. |
— |
Absetzgrube / drainage ditch. |
— |
Rutsche / [corpse] chute. |
— |
Belüftung / ventilation |
— |
Unterzug / joist. |
— |
Eisenbeton — Bohlendecke / reinforced concrete roof beams. |
— |
Aufzug / corpse lift. |
— |
Entlüftung / air extraction. |
— |
Entlüftungskanal / air extraction duct. |
— |
Verbrennungsraum / incineration room [furnace room]. |
— |
Betonboden m[it] Glattstr[ich] / concrete floor with smooth screed. |
— |
Vorlage 18cm HGH [?] / 18cm hard fill … |
— |
Gewachsener Boden / natural earth. |
Drawing 1173: |
— |
Anschüttung / earth bank. |
— |
Belüftungskanal vom Dachgeschoss / ventilation duct from roof space. |
— |
Entlüftungskanal — Verbindung [unter d. N.G. Fussboden] / air extraction duct junction [below new ground level]. |
— |
Belüftungskanal — Verbindung / ventilation duct junction. |
— |
Anschüttung / earth bank. |
— |
Entlüftungskanal zum Dachgeschoss / extraction duct to roof space. |
— |
Neue Geländehöhe / new ground level. |
— |
Gewachsener Boden / natural earth. |
— |
KREMATORIUM — Zutritt verboten / CREMATORIUM — keep out |
|