ANNEXES
CHRONOLOGY OF THE DRAWINGS OF KREMATORIEN II AND III |
|
|
|
|
List as of mid January 1943 of the Bauleitung
drawings produced for the
construction of Birkenau Krematorien II and III
(classified as BW 30 and 30a respectively): |
932 |
|
Plan [of basement] (manuscript: in drawer) |
933 |
|
Ground floor |
934 |
|
Sections |
935 |
|
West elevation |
936 |
|
North elevation |
937 |
|
East elevation |
938 |
|
South elevation |
980 |
|
Roof frame |
1173 |
|
Cross section of the Leichenkeller [1] with the ventilation and air extraction installations |
1174 |
|
Cross-section of the basemented area |
1301 |
|
Foundation plan (in drawer) |
879 |
|
Proposal for the construction of a provisional Krematorium in the POW ramp |
1062 |
|
POW camp Krematorium |
1300 |
|
Krematorium drainage system |
1311 |
|
Correction sheet to basement plan |
1341 |
|
Details of doors, dormer windows [not held] |
1434 |
|
Construction of chimney for Krematorium [II. Dated 3/6/42. Not held] |
1740 |
|
Sketch of former window [not held] |
1745 |
|
Krematorium 3 [III] chimney [not held] |
|